How the Need for Speed Can Lead to Costly Problems in Construction

How the Need for Speed Can Lead to Costly Problems in Construction

The construction industry is a fast-paced environment. Deadlines are tight, margins are narrow, and the pressure to deliver on time is relentless.

While speed is often seen as a competitive advantage, prioritizing it above all else can result in significant issues. From compromised safety to higher costs and diminished quality, the consequences of rushing construction projects are both immediate and long-term.

A recent Construction Dive article highlighted the top concerns of structural engineers, revealing that the push for speed is a major factor influencing project outcomes. As industry professionals seek to accelerate timelines, understanding the potential pitfalls of haste becomes essential for developers, contractors, and stakeholders alike.

Safety Risks and Worker Well-Being

One of the most concerning consequences of prioritizing speed in construction is the increased risk to worker safety. Rushing through tasks often results in overlooked safety protocols, insufficient site inspections, and incomplete hazard assessments. Workers are more likely to skip essential safety measures or use improper tools and equipment when deadlines are looming.

According to Construction Dive’s reporting, structural engineers have expressed growing concern over rushed schedules, especially in large-scale infrastructure projects. Without adequate time to review site conditions or ensure that safety measures are in place, the likelihood of on-site injuries and fatalities increases. This issue not only threatens the well-being of workers but also exposes construction firms to potential lawsuits, fines, and reputational damage.

The Occupational Safety and Health Administration (OSHA) highlights that falls, struck-by incidents, and equipment-related accidents are among the "Fatal Four" causes of construction site fatalities. When workers are pressured to move quickly, these risks are amplified. Mitigating them requires more than adherence to OSHA standards—it demands a cultural shift that prioritizes safety over speed.

Compromised Quality and Structural Deficiencies

Speed-driven construction often sacrifices quality. When contractors are pressured to meet aggressive timelines, attention to detail can falter. Materials may not be installed according to manufacturer guidelines, and inspections may be rushed or skipped altogether. This can lead to latent defects, such as improper concrete curing, misaligned structural components, or undetected cracks and leaks.

Structural engineers are increasingly wary of fast-tracked projects, especially those that reduce the time allocated for engineering reviews. Without sufficient time for thorough analysis, there is a greater risk of structural deficiencies that may only become apparent after project completion. Defective construction can result in costly repairs, delays, and even catastrophic failures.

Design changes often occur during construction. When speed is a priority, these modifications may not be fully vetted. Coordination between architects, engineers, and contractors can break down, leading to inconsistencies in plans and execution. These issues can be difficult to identify until after the project is complete, at which point remediation costs skyrocket.

A man pinching his nose and pushing his glasses up his face while sitting in front of a laptop.
While speed is often seen as a competitive advantage, prioritizing it above all else can result in significant issues.

Increased Project Costs and Rework

Ironically, the quest for speed in construction often leads to higher costs. While the intention is to reduce labor hours and meet deadlines, the reality is that mistakes caused by haste frequently require costly rework. Rework includes tearing down and rebuilding flawed components, replacing substandard materials, and fixing systems that were improperly installed.

Industry research has shown that rework can account for as much as 5-15% of a project's total cost. For large infrastructure projects, this can mean millions of dollars in unexpected expenses. The financial impact is compounded when delays caused by rework push back project completion, leading to penalties for late delivery.

Fast-tracked projects often fail to allow sufficient time for design review and clash detection. Without adequate time for these processes, unforeseen design conflicts emerge during construction, resulting in costly on-site changes. Digital tools like Building Information Modeling (BIM) can help identify potential clashes, but when speed is prioritized, these processes may be abbreviated or skipped entirely.

Supply Chain Disruptions and Material Shortages

A fast-track approach requires precise coordination with suppliers and subcontractors. However, supply chain disruptions—such as material delays, labor shortages, or equipment backorders—can derail even the most well-intentioned project timelines. In an environment where just-in-time delivery is standard practice, any disruption can cause cascading delays.

Material shortages, like those seen during the COVID-19 pandemic, further complicate speed-driven schedules. Contractors may be forced to source alternative materials or accept substandard options, leading to quality issues down the line. Additionally, expedited shipping and last-minute sourcing come at a premium, driving up project costs.

Reduced Collaboration and Communication Breakdowns

Effective communication is essential for any construction project. However, when speed takes precedence, communication can become fragmented. Team members may be less inclined to raise concerns or seek clarification for fear of causing delays. As a result, miscommunication can lead to errors, rework, and disputes.

Collaboration between structural engineers, architects, and construction managers is vital. Without clear lines of communication, design flaws can go unnoticed until they become major issues. Fast-track projects often have less time for coordination meetings and fewer opportunities for collaborative problem-solving, increasing the likelihood of misunderstandings and errors.

Regulatory Compliance and Legal Exposure

Compliance with building codes, zoning laws, and environmental regulations is non-negotiable in construction. However, when speed is the primary goal, there is a tendency to cut corners or "overlook" certain regulatory requirements. Insufficient time for permit approvals and inspections can lead to non-compliance, which in turn results in fines, work stoppages, and legal battles.

Construction Dive reports that regulatory compliance is a key concern for structural engineers who see fast-tracked schedules as a threat to code adherence. Construction firms that bypass necessary approvals or fail to conduct proper inspections face significant liability. Legal exposure extends to project owners, developers, and subcontractors, who may all be held responsible for non-compliance.

How to Mitigate the Risks of Speed-Driven Construction

Given the significant risks posed by speed-focused construction, it’s essential to implement measures that prioritize safety, quality, and efficiency. Here are some strategies to strike a balance between speed and precision:

  1. Plan Realistic Schedules: Avoid "crash scheduling" and instead create timelines that account for design reviews, inspections, and site preparation.
  2. Invest in Technology: Use tools like BIM to detect design clashes early and ensure proper coordination among stakeholders.
  3. Prioritize Safety Training: Emphasize safety as a core value, provide ongoing training, and encourage workers to report hazards without fear of retribution.
  4. Build Contingencies: Allocate time and budget for potential disruptions, including rework, delays, and supply chain issues.
  5. Enhance Communication: Foster open communication among architects, engineers, and contractors, and schedule regular collaboration meetings.
  6. Commit to Regulatory Compliance: Designate a compliance officer to oversee regulatory adherence, permit approvals, and inspection protocols.

How GPRS Helps Keep Construction Projects On Time, On Budget & Safe

GPRS can help keep your projects not only on schedule, but also on budget and safe through our suite of subsurface damage prevention, existing conditions documentation, and construction & facilities project management services.

Dig, cut or core with confidence knowing our SIM-certified Project Managers accurately located and mapped all buried utilities on your jobsite. We use state-of-the-art technology, including ground penetrating radar (GPR) and electromagnetic (EM) locating to tell you where it’s safe to break ground – and where doing so could have disastrous consequences.

Our 3D laser scanning and mapping & modeling services visualize everything on your site – including what’s above and belowground – so you can plan efficiently.

And all this accurate, actionable data is at your fingertips 24/7 thanks to SiteMap® (patent pending), our project & facility management application that provides accurate existing conditions documentation to protect your assets and people.

From skyscrapers to sewer lines, GPRS Intelligently Visualizes The Built World® to keep your projects on time, on budget, and safe.

What can we help you visualize?

Frequently Asked Questions

Can GPRS utility locating services find PVC piping and other non-conductive utilities?

GPR scanning is exceptionally effective at locating all types of subsurface materials. There are times when PVC pipes do not provide an adequate signal to ground penetrating radar equipment and can’t be properly located by traditional methods. However, GPRS Project Managers are expertly trained at multiple methods of utility locating.

How is GPR used to identify tendons vs. rebar in a post-tensioned slab?

In post-tensioned structures, we typically find one mat of support rebar near the base of the slab. This mat is generally consistently spaced and remains at a constant elevation. Post-tension cables are generally found above this support mat and “draped” throughout the rest of the structure. The elevation of the cable is usually high near the beams and column lines and drapes lower through the span between beams and column lines. Knowledge of these structural differences allows us to accurately differentiate between components. Our Project Managers will leave you feeling confident in our findings and in your ability to drill or cut without issue.

What deliverables can GPRS’ 3D laser scanning, and mapping & modeling services provide?

We can provide 3D modeling in many formats such as:

  • Point Cloud Data (Raw Data)
  • 2D CAD Drawings
  • 3D Non-Intelligent Models
  • 3D BIM Models
  • JetStream Viewer

Customizable Deliverables Upon Request

  • Aerial Photogrammetry
  • Comparative Analysis
  • Deformation Analysis
  • Digital Drawings of GPR Markings
  • Floor Flatness Analysis/Contour Mapping
  • New Construction Accuracy Analysis/Comparative Analysis
  • Point Cloud Modeling Training Webinars
  • Reconciliation of Clients 2D Design Drawings
  • Reconciliation of Clients 3D Design Model
  • Structural Steel Shape Probability Analysis
  • Template Modeling
  • Volume Calculations
  • Wall Plumb Analysis